Iberian Tungsten

Seed round investment opportunity

Invest Early in Europe's Next Tungsten Producer

  • Equity raise: Canadian company reactivating Vila Seca – Santo Adrião, Portugal

  • Defined resource: JORC (2016), 10,308 m drilled, two trial-mine adits

  • High Grade: Average grade of 0.27% tungsten equals ~6% copper equivalent

  • Pre-IPO entry: targeted for H2 2027

  • Experienced team: track record in mine development and restarts

Closing date: 15 December 2026

Request investor pack
C$2.0M
Seed round at C$0.50/share
C$14M
Pre-money valuation
4.47 Mt
@ 0.27% WO₃, JORC (2016)
H2 2027
Targeted public listing

From the founders of:

ChanceryGold RoadPure TungstenAmapaLaivaPilar Gold

Company overview

Why Iberian Tungsten

A de-risked route into European tungsten supply

Iberian Tungsten is a Canadian critical-minerals company reactivating the Vila Seca – Santo Adrião tungsten deposit in northern Portugal, set to become the first new mine in the country in 45 years.

Strategic supply

1st

mine in Portugal in 45 years

Vila Seca – Santo Adrião would supply Europe from within.

Defined resource

4.47 Mt

@ 0.27% WO₃ · JORC (2016)

Backed by 10,308 m of drilling in 67 holes, giving a solid geological base for the pre-feasibility study in 2027.

Already underground

2 adits/portals

67 m of trial-mine development

Underground access is already in place at the deposit, about 95 km east of Porto, shortening the road to production.

Early entry

C$0.50

per share · C$14M pre-money

Seed investors come in before the targeted H2 2027 public listing and H2 2029 start of production.

Request investor pack
The team at the trial-mine adit
The team at the trial-mine adit
Trial-mine adits and access roads on site
Trial-mine adits and access roads on site
Scheelite under UV light – tungsten mineralisation drilled on site
Scheelite under UV light

Tungsten mineralisation drilled on site

⚒️ Path to Listing & Production

From Seed Round to Production by 2029

2026Funding
  • Q4Seed Round Funding
2027Studies
  • Q1Block Model Review
  • Q2Valuation & plant design
  • Q3Pre-feasibility study
  • Q4Infrastructure & compliance
KEY MILESTONE
H2 2027

Public listing

Planned move from private company to listed tungsten developer

2028Licensing
  • Q3Environmental licence
  • Q4Definitive mining licence
  • Q4Construction start
H1 2029
  • Construction completion
TARGET
H2 2029

Production

First tungsten concentrate from Vila Seca – Santo Adrião

Resource: JORC 2016, 4.47 Mt @ 0.27% WO₃ at a 0.1% WO₃ cut-off. The roadmap reflects management targets and forward-looking statements; timing depends on permits, financing and study results and may change. Not an offer to sell securities; any investment is made only on the basis of the formal offering documents. Early-stage mining investments are high-risk.

SEED ROUNDCAD 2.0M at CAD 0.50 per share

📈 Upside on Investment

Iberian Tungsten offers early, seed-stage entry into a Western tungsten project at the point of reactivation. The timing is aligned with rising tungsten prices, growing demand for reliable non-Chinese supply and China’s new export limits.

Rising prices, driven by demand

APT, the benchmark tungsten product, roughly doubled during 2025, from about US$331 to US$675 per mtu (USGS), and reached about US$3,100 by October 2026. For Iberian Tungsten, higher prices raise the value of its 4.47 Mt resource in the ground and improve the economics of a future mine, which is what drives value for shareholders.

Demand for reliable non-Chinese supply

Western defence and industrial buyers need tungsten from outside China, and few new sources exist in Europe. As a European project, Iberian Tungsten is positioned to supply these buyers directly; Western supply trades at a strategic premium.

China’s new export limits

China, the dominant producer, now requires a licence for every tungsten export. With less Chinese material reaching the market, buyers need new Western sources, which puts Vila Seca – Santo Adrião in a stronger position with future customers and financiers.

Upcoming IPO as a re-rating point

A public listing is targeted for H2 2027. The current round of C$0.50 values Iberian Tungsten at just C$14M pre-money, giving seed round investors significant upside potential once the company lists publicly.

Value-creation milestones ahead

Permitting, mine restart and first concentrate production are all targeted before H2 2029. Investors who enter at the seed round level benefit from every step as Iberian Tungsten moves toward production.

Tungsten price · APT Rotterdam · US$ per mtu
~$330→~$2,800
Up roughly 8.5× since the start of 2025, and holding
$0$1,000$2,000$3,000Jan 2025Jul 2025Jan 2026Jul 2026~$330Jan 2025~$2,800Oct 2026

Sources: Argus via USGS (start of 2025); Fastmarkets (Jun 2025 – Jul 2026); Shanghai Metals Market (Oct 2026). Ranges shown at midpoint.

Why Tungsten, Why Now

Prices, Policy and Supply All Point the Same Way

Supply is concentrated

One country controls the market

China produced ≈67,000 t of the world's ≈85,000 t of tungsten mine output in 2025. The rest is supplied from a handful of mines in Vietnam, Russia, Bolivia, Rwanda, Austria, Spain and Portugal. Europe relies on imports for about 73% of the processed tungsten it uses, with China being its largest supplier.

79%from China
● China ≈67,000 t
● Rest of world ≈18,000 t
USGS 2026 (2025 estimate)
Policy has changed the rules

Export controls, defence bans and EU targets

In less than two years, tungsten has transformed from an overlooked industrial metal into a valuable strategic asset.

As China tightens its grip on exports, the US and EU are accelerating efforts to secure independent supply chains. Governments and industries are no longer simply looking for tungsten — they are looking for reliable, traceable supply outside China.

Feb 2025

China export licensing

Tungsten added to China's export-control list. Every shipment now needs a case-by-case licence, tightening supply to Western buyers.

2025

Chinese quota cut

First-batch mining quota cut by 6.5% as domestic ore grades decline, leaving less material for export.

Feb 2026

US Project Vault

US$12B strategic stockpile launched to secure critical minerals, including tungsten: a large new buyer for non-Chinese supply.

1 Jan 2027

US defence ban

Tungsten metal, powders, heavy alloys and parts in US defence contracts may not be mined or produced in China, Russia, North Korea or Iran (DFARS 252.225-7052).

2030

EU CRMA benchmarks

Tungsten is an EU strategic raw material. Targets by 2030 include: 10% of EU demand mined in the EU, 40% processed, 25% recycled, and no more than 65% from any one country.

Demand keeps growing

Demand rises while supply falls behind

Annual global demand for tungsten is forecasted to grow by about a quarter in five years, from 130,000 t to 163,000 t. While at the same time supply is unable to keep up.

Global tungsten demand, 2025 → 2030
130k t
2025
163k t
2030
+26%
≈33,000 t of extra annual demand in five years
Fastest-growing uses, growth to 2030
Solar PV
+119%
Batteries
+101%
Semiconductors
+76%
Defence
+47%

Tungsten is the densest practical metal with the highest melting point of any metal. In cutting tools, armour, chips and electrodes it has few or no substitutes.

Source: Grand View Research, tungsten market outlook 2025–2030.
Global tungsten market balance, 2020–2030
Industry forecasts show supply falling short of demand, with the gap widening to 2030
Forecast supply minus demand, tonnes of contained tungsten · three independent forecasts
Angus Tungsten AnalyticsRoskill (Outlook to 2030)ITIA end-use study
+15,000+10,000+5,0000−5,000−10,000−15,000−20,000−25,000−30,00020202021202220232024202520262027202820292030▲ SURPLUS▼ DEFICIT2030 gap:20,000–25,000 t Sources: Angus Tungsten Analytics (2021); Roskill, Tungsten Outlook to 2030 (2021); ITIA, End-Use Tungsten (2021), compiled by EQ Resources. All three are forecasts published in 2021; values read from the source chart and rounded to the nearest 1,000 t.
The market needs new mines

Why new supply is needed

Tungsten is no longer just an industrial metal but a geopolitical asset. Very few tungsten projects in Europe or North America are close to production.

Iberian Tungsten aims to be one of them.

5–7 yrs

Lead time for a greenfield mine

Supply ordered today arrives after 2030; restarts with existing infrastructure move faster.

~35%

Of supply from recycling

Scrap helps, but cannot close a structural deficit on its own.

0.40% → <0.28%

Falling Chinese ore grades

Lower grades in Jiangxi mean higher costs and less output.

−20–25 kt

Forecast annual deficit by 2030

New, traceable European tonnes are needed for EU and NATO demand.

Sources: USGS Mineral Commodity Summaries 2026; MOFCOM/GAC Announcement No. 10 (Feb 2025); Edison Investment Research (May 2026); DFARS 252.225-7052; Regulation (EU) 2024/1252; Grand View Research 2025–2030; Angus Tungsten Analytics, Roskill, ITIA (2021).

Iberian Tungsten Seed Round Key Information

Raise
C$2.0M
Price per share
C$0.50
Pre-money
C$14M
Minimum
C$5,000
Closing date15 December 2026
Type of raise

Seed equity round (private placement)

Description

Iberian Tungsten Inc. – A Canadian critical minerals company reactivating the Vila Seca – Santo Adrião tungsten project in northern Portugal.

Securities

Common shares of Iberian Tungsten Inc. (Canada)

Terms

Private placement at C$0.50 per share. Minimum investment C$5,000.

Use of proceeds

Restart of the Vila Seca – Santo Adrião project

Request Investor Pack:

Iberian Tungsten Seed Round

You should receive the investor pack in 30 minutes. Your information stays private.

+1